Construction Continues at Biblical Life
Construction Continues at Biblical Life
As I am writing this post, the sounds of hammers, saws, and more are loudly blaring in the background. The flooring is being placed down, doors are being installed, and trim is being cut and nailed into place. Our office will be way too loud and hectic to attempt to record a podcast this week.
If all goes as planned, the construction/remodeling side of this project will be completed this week. Then we can move forward it setting up the areas for the two TV studios: from furniture and decor to sound systems and cameras.
Our two-month-long journey of 10 to 12 hour days six days a week has about come to a close. We are hoping to have everything back to normal by January 1 and then will begin the long process of catching up on two months of emails and phone calls. To be honest, after two months of drywalling, repairing, and painting, it will be nice to put down the hammer to pick up a keyboard and phone for a while.
Thank you for all of your prayers and support in this historic expansion of our ministry!
Dr. Michael K. Lake
December 19, 2017 at 6:01 pm
Do y’all have any meetings for local folks to gather with you for church fellowship? 😍
December 29, 2017 at 4:53 pm
Biblical Life TV is recorded in a closed TV studio. It is not currently open to the public.